An gallery of the updated conceptual design has been uploaded below. Some exterior detail and additional design detail has been added to the model. To make it easier to differentiate, the existing middle school roof is a darker color, while the new building area remains white. Once again, the pictures should provide some information on progress being made. In addition, a site plan is available for viewing here. This shows some extra detail on features around the site such as playgrounds, parking, and drop off points. Again, changes are still being made to the plan and nothing is final.
Some pictures of the current conceptual design have been posted to the photo gallery.
